• Login
    View Item 
    •   Home
    • Graduate Theses, Dissertations and Projects
    • Queen's Graduate Theses and Dissertations
    • View Item
    •   Home
    • Graduate Theses, Dissertations and Projects
    • Queen's Graduate Theses and Dissertations
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Geomorphic and Fluvial Response to Recent Permafrost Disturbances in a High Arctic River, Cape Bounty, Nunavut

    Thumbnail
    View/Open
    Veillette_Maryse_A_201112_MSc.pdf (3.503Mb)
    Date
    2011-12-09
    Author
    Veillette, Maryse
    Metadata
    Show full item record
    Abstract
    Using a sediment budget approach, suspended sediment transport dynamics were studied over the 2010 summer runoff season in the 8 km2 West River catchment at the Cape Bounty Arctic Watershed Observatory (CBAWO), Melville Island, Nunavut. Research was carried out in an effort to determine the longer term impacts and response of recent (2007-8) active layer detachments (ALD) on the river system. In 2010, measured ALD inflows contributed 4.7% of the measured sediment yield, a decrease of 13.3% from 2007 when they initially formed. This indicates that while they continue to supply sediment to the main river, the impact they have on sediment fluxes, and hence the sediment budget has diminished, with time. Results from the sediment budget indicate that connectivity and the sediment delivery ratio within the system have also decreased with time. Sediment budget analysis shows that in response to this additional sediment, the West River progressively stores more sediment throughout the season, storing as much as 85% of sediment inflows during baseflow. Sediment was preferentially deposited within the channel, with coarser material deposited in the upper reaches, and finer material deposited in the lower reaches. Similarly, the transported and stored sediment became progressively finer with time, indicating the importance that river competence and wetted perimeter have on sediment transport as the larger sediment was entrained earlier in the season under higher flow conditions when the sediment was accessible, and finer sediment transported later in the season due to decreased competence and reduced accessibility of sediment. This sediment storage is expected to replenish sediment in the channel that is eroded during peak discharge in spring, and also dampens the effects that disturbances have on the sediment budget through storage. Sediment stored in the channel towards the end of the season does not contribute to sediment yield and may prove to be an important source of sediment in future years under late summer rainfall events.
    URI for this record
    http://hdl.handle.net/1974/6901
    Collections
    • Queen's Graduate Theses and Dissertations
    • Department of Geography and Planning Graduate Theses
    Request an alternative format
    If you require this document in an alternate, accessible format, please contact the Queen's Adaptive Technology Centre

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of QSpaceCommunities & CollectionsPublished DatesAuthorsTitlesSubjectsTypesThis CollectionPublished DatesAuthorsTitlesSubjectsTypes

    My Account

    LoginRegister

    Statistics

    View Usage StatisticsView Google Analytics Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    Atmire NV